ERMCO SCOPE CLARIFICATIONS
1.Provide and Replace bulbs (LED) in house fixtures
2.Replace 10 side/sconce lighting fixtures set for line voltage dimming
3.will extend Qt 2 Circuits on each side of room (Total Qt 4) to the next beam into the room. Will remove current dimmed circuits from the dimmer panel and provide and install a new panel for the spot lighting circuits. 4.install Qt 2 Circuits above the Choir Loft
5.Replace ceiling can lights under balcony at entrance (LED)
6.will provide and install new can lighting that is DMX or 0-10V to provide home run of DMX or 0-10V to Rack Room
7.Provide circuits to dimmer rack and lamps for the choir side can swivel lights
8.Provide a switch and feed the Cross from the dimmer rack
9.Add circuit for the new Din box in electrical room.
10.Provide a lift for Ermco and Force Tech for no more than two weeks.
11.Not responsible for any existing wiring, sockets or existing electrical power and equipment that is not in good working condition. Any repairs will be done at time and material.